The 150 acre Vanadium site consists of a 25 acre parcel owned by Airco Properties, Inc. (Airco), a 37 acre parcel owned by CC Metals and Alloys, Inc. (CCMA), and an 88 acre parcel (a utility right of way) owned by New York Power Authority (NYPA) and Niagara Mohawk Power Corporation (NiMo). The CCMA parcel has been designated by the New York State Department of Environmental Conservation (NYSDEC) as OU1, the Airco parcel has been designated as OU2, and the NYPA and NiMo parcel has been designated as OU3. The site consists of a large central area and two long narrow legs that extend west of the central area. Areas of the site were used for disposal of slag. An existing slag mound in the central area is approximately 30 acres in size. A Record of Decision was negotiated between the responsible parties and the New York State Department of Environmental Conservation. Upon completion of the remedial design a bid package was released for implementation of the selected remedy. Sevenson was awarded the contract on a competitive bid basis.
Olcott Harbor Breakwater Construction
Location
Niagara Falls, New York
Contract Value
$13,770,000
Period of Performance
July 2013 – December 2014
Role
Prime Contractor
Create stunning designs easier than ever before
Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live.
It's just that easy to make something amazing
Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live.
Rooted in Remedial Construction
Expanded into Environmental Dredging
Remedial ConstructionEnvironmental DredgingAdditional Services